Composite Repair

Engineering solutions for pipeline and facility repair and reinforcement

Composite Repair

SHAREGAS provides engineering solutions for the repair and reinforcement of pipelines and industrial facilities using advanced composite systems, including carbon-fibre technologies.

Where technically suitable, these solutions can restore infrastructure affected by corrosion, wall-thickness loss, and other defects while reducing the need for section replacement and operational shutdowns.

Our services combine engineering design, repair-system selection, surface preparation, professional application, and quality control, in accordance with project requirements and applicable standards.

Composite repair application at an industrial facility at night
Composite repair work on an underground pipeline
Composite repair equipment and materials in a field service trailer

Engineering Design

Defect assessment, review of operating conditions, and selection of a suitable repair system.

Field Application

Surface preparation and repair-system installation according to the project specification.

Quality Control

Inspection and quality checks throughout application and completion.

Engineering Standards

Our composite repair solutions are engineered and applied in accordance with the applicable requirements of internationally recognized standards, including ASME PCC-2 and ISO 24817, as relevant to each project.

ASMEPCC-2
ISO24817
Pipe section wrapped with carbon-fibre layers – 12-inch line case study
Original case-study photograph – pipe section after application of the carbon-fibre system

12-Inch Naphtha Line – 62% Wall Thickness Loss

Challenge

An intelligent pig inspection identified corrosion-related anomalies in a naphtha pipeline, including 62% wall-thickness loss. The client sought to avoid pipe-section replacement while maintaining continuous flow.

Solution

Following engineering assessment and calculations, the pipe surface was abrasive-blasted to a cleanliness level consistent with NACE 2. An epoxy primer and carbon-fibre reinforcement were applied over an 800 mm section.

Outcome

The repair was completed in approximately four hours, including surface preparation and material application, without interrupting flow. Adhesive curing was subsequently checked using a Rockwell C test.

Operating pressure: 10 bar · Temperature: 35°C · Nominal wall thickness: 9.6 mm · Wall-thickness loss: 62%

Vertical pipe section with a carbon-fibre repair – 4-inch line case study
Original case-study photograph – pipe area after application of the repair system

4-Inch Hexane Line – Full Wall Loss and Active Leak

Challenge

An active leak developed in a hexane pipeline at a location with complete wall-thickness loss. The client required a repair solution without cutting out and replacing the affected section.

Solution

A carbon-fibre repair system was installed without additional clamps or seals. The work included pneumatic surface preparation, surface-roughness verification, epoxy primer application, and carbon-fibre reinforcement over a 1,200 mm section.

Outcome

Surface preparation and repair-system application took approximately four hours. According to the project documentation, the pipeline returned to service after approximately 24 hours, following completion of the repair and leak stoppage.

Operating pressure: 10 bar · Temperature: 120°C · Nominal wall thickness: 6 mm · Wall-thickness loss: 100%

Local carbon-fibre repair on a tank surface – floating-roof tank case study
Original case-study photograph – carbon-fibre repair area on the tank surface

Floating-Roof Fuel Tank – Corrosion and Active Leaks

Challenge

Multiple corrosion areas and active leaks were identified on the floating roof of a fuel storage tank.

Solution

Local repairs were performed using a carbon-fibre composite system to address the affected areas and leaks.

Outcome

According to the project documentation, the leaks were stopped using the carbon-fibre system.

Application: Localised repair of a floating-roof fuel tank

Carbon-fibre repair around a pipe section and elbow – 8-inch line case study
Original case-study photograph – pipe section after application of the carbon-fibre system

8-Inch Pipeline – 49% Wall Thickness Loss

Challenge

A pipeline exhibited 49% wall-thickness loss at a section transitioning below ground level.

Solution

A local carbon-fibre composite repair was performed on an operating pipeline.

Outcome

The available documentation records the composite repair on the operating pipeline; the full execution details are not specified.

Key data: Wall-thickness loss 49%